Here's the latest update:
Shingles are on and the roof is almost complete. Thaxton Roofing will be back once the chimney is finished to complete the roof.
Paramount Plumbing has been out installing the plumbing. There are pipes everywhere! The little wall in the above picture is going to be apart of our island in the kitchen.
Soffets have also been constructed and put in place. (may have spelled soffet wrong?)
Big Al built the base for our bath tub!
This is the back wall where the chimney will be. The stone for the chimney will go all the way up to the ceiling.
This is the view from the loft on the second floor.
Tub/shower unit for the upstairs bath. This had to be put in already because it will be built in to the drywall. A bunch of strong men came over to help get it up to the second floor as we do not have steps yet.
And this is a close up of the shingles! There are supposed to be specks of green and brown and tan in them. The color will be more visible once the siding is up next to it.
No comments:
Post a Comment