Monday, June 7, 2010

Favorite Neighbor Ed and Super Spicer!

After the rain cleared we made major progress. Ed and Spicer graciously volunteered their valuable time and joined Big Al, Albert and Rob in installing the floor joists.
Minor setback during the process...We realized one of the steal beams was a bit too long, therefore Padge had to show us how even more talented he is, and using a blow torch and a saw, cut about 4 inches off of the steal beam.
Once the steal beam was cut, the floor joists were measured, cut, and put in place. Albert and Rob did most of the heavy lifting, Favorite-Neighbor-Ed manned the saw, and Super Spicer and the Padge measured and fastened the joists in place.
Thanks to the added extra help of Albert, Ed and Spicer, we were quite satisfied when Sunday came to an end!

No comments:

Post a Comment